For these two stadiums – each holding 45,000 spectators – the comprehensive formwork and scaffolding concept was usefully supplemented by the PERI TRIO and DOMINO wall formwork systems as panel formwork as well as VARIO GT 24 as girder wall formwork. MULTIFLEX girder slab formwork combined with UZR beam walers were used to build both slabs and beams.de www.Apart from the low weight and the high load-bearing capacity, the PERI MULTIPROP has a large extension length, a big advantage for the range of different storey heights.950-1180Fax: +49 (0) 7309.PERI GmbHEditorial OfficeP.O.

The 34 cm thick reinforced concrete slab of the seven-storey high grandstand in the Greenpoint Stadium was formed using PERI panel slab formwork SKYDECK with MULTIPROP slab props.deRe-prints are free of charge quoting "Source: PERI GmbH".Moses Mabhida StadiumThe PERI TRIO panel formwork and the VARIO GT 24 girder wall formwork also played a crucial role for the construction of the Moses Mabhida Stadium in Durban.Mbombela Stadium and Vodacom Park StadiumFor the construction of the Mbombela Stadium in Nelspruit and the Vodacom Park Stadium in Bloemfontein, the PERI MULTIPROP system provided high load-bearing capacities and a high degree of flexibility – finding use as individual slab props and frame-connected shoring towers.

This meant that the cantilevered formwork for the slab edges could be supported for the height of several floors with the loads being safely transferred to the ground. 2009 revenues was 873 million Euros.Contractors:- Murray, Roberts, WBHO Joint Venture (Greenpoint Stadium, Cape Town)- WBHO, Group Five, Pandev Joint Venture (Moses Mabhida Stadium, Durban)- Basil Read, Bouygues Joint Venture (Mbombela Stadium, Nelspruit)- Ruwacon, Sanyati, Ikaheng, Promania Joint Venture (Vodacom Park Stadium,, Bloemfontein)PERI Systems In Use- DOMINO Panel Wall Formwork- MULTIFLEX Girder Slab Formwork- MULTIPROP Slab prop- MULTIPROP System- SKYDECK Aluminium Panel Slab Formwork- TRIO- VARIO GT 24 Girder Wall FormworkPERI was founded in 1969 and is today the leading provider of formwork and scaffolding systems. Through the low individual weights of the aluminium components and the systematic assembly sequence, work could be carried out both quickly and fatigue-free. Connected with MULTIPROP frames, the slab props were also used as shoring towers. June 2010 | Soccer stadiums for the 2010 World Cup, South AfricaBeginning on 11 June, nine South African cities will be the venues for the 2010 FIFA World Cup – on 11 July after 64 matches, the new world champion will be crowned.peri. Please send a copy to the PERI Editorial Office.000 and is the venue for eight matches during the World Cup.01. Along with the headquarters in Weißenhorn, Germany, the company has 48 international subsidiaries and 100 stock yards around the world.This release was published on openPR. Complete project support and rental logistics was handled by Wiehahn, authorized PERI dealer in South Africa. In addition, the SKYDECK drophead system ensured short striking times as panels and main beams were available for the next cycle in a very short space of time. However, German-South African participation has already taken place in the preceding months: this is because four stadiums in Durban, Cape Town, Nelspruit and Bloemfontein – with seating capacities for between 45,000 and 70,000 spectators – were constructed or enlarged with the help of PERI formwork and scaffolding systems. Supplementing this were the PERI TRIO and VARIO GT 24 wall formwork systems for the stairwells and lift shafts.

 The VARIO GT 24 wall and column formwork system also demonstrated its versatility for the construction of numerous reinforced concrete columns and elevator shafts as well as the inclined grandstand support beams which were realised extremely accurately and with a high concrete quality cast in-situ. With the highly versatile TRIO system, the ballast tanks underneath the stadium structure together with the architectonic fair-faced concrete walls of the five access tunnels to the pitch and the three enormous abutments for the arch support structure of the stadium Passenger elevator Manufacturers roof were formed.The Greenpoint Stadium in Cape Town has a seating capacity of almost 70. Using GT 24 formwork girders allowed large spans which meant intermediate supports could be avoided as far as possible The VARIO formwork elements were pre-assembled at the Wiehahn rental park and delivered punctually ready-to-use on the construction site in accordance with the building schedule.


مشخصات

  • جهت مشاهده منبع اصلی این مطلب کلیک کنید
  • کلمات کلیدی منبع : formwork ,peri ,stadium ,with ,slab ,were ,wall formwork ,greenpoint stadium ,joint venture ,slab formwork ,girder wall ,moses mabhida stadium ,formwork multiflex girder ,wall formwork multiflex ,wall formwork systems
  • در صورتی که این صفحه دارای محتوای مجرمانه است یا درخواست حذف آن را دارید لطفا گزارش دهید.

تبلیغات

محل تبلیغات شما
محل تبلیغات شما محل تبلیغات شما

آخرین وبلاگ ها

برترین جستجو ها

آخرین جستجو ها

فروشگاه پرشین Carlos کامپیوتر و اینترنت Steve کد USSD اختصاصی مشاغل و ارگان های دولتی arshia site دفتر پیشخوان دولت کافی نت کرال ايران نيسان